Quality assurance
A, seriously implement the project manager responsibility system to fully mobilize the enthusiasm of people, strengthen the quality awareness of construction personnel, change the priority to win the standard for practical action, at the same time equipped with a good adjustment of the construction organization, select a group of professionals with high technical quality and rich practice into the installation team.
B, establish and improve the site management system, including the company's "installation and construction management regulations" and "material procurement, transportation and storage system", "post responsibility system", "safety and civilization implementation system".
C, the raw materials and equipment used in this project must be purchased according to the best quality, the selection of famous products, all lamps must be prepared by the relevant quality supervision department inspection of qualified reports, to eliminate fake and shoddy products.
D. The quality control of the construction process should pay full attention to the control of the five factors of human, machine, material, law and environment, adhere to the layers of checks and layers of implementation of each process, the implementation of personal self-inspection, project mutual inspection, quality inspection engineer special inspection of the three procedures, and make records. Quality inspection shall be carried out in accordance with relevant national standards and IEC international standards.
E, the quality of key parts is related to the long-term use of functional life and safety in the future, must be paid attention to and tested. The whole process of monitoring and testing the light distribution uniformity, illuminance, grounding resistance, insulation and other indicators of the lamp light source to ensure the reliable grounding of electrical equipment.
F, full-time inspection engineers, every day to the project and entry of the quality of raw materials for inspection records, make marks. Only the equipment and raw materials accepted by the supervision engineer can be put into installation and commissioning. For the construction and installation quality problems, we must adhere to the principle of three not let go: the reasons are not clear; Not clear responsibility will not let go; No improvement measures will be spared.
G. The installation team regularly holds a stage evaluation summary meeting to evaluate the quality level of the completed projects, reward the good and punish the bad, encourage the advanced, and sum up experience to facilitate the re-battle.